Case Study – Interim Capel Street Improvement works
Introduction
Avondale Landscapes worked alongside the team from Cairn Construction to carry out the soft landscape aspect on Capel Street, Dublin City Centre. The works included executing the design from BSLA.
Duration
One-month landscape works with 1-year ongoing maintenance.
CLIENT
Cairn Construction
Location
Capel Street Dublin 1
Landscape Architect
BSLA
Key Features
Root barrier
live street
pedestrian management
Tidy work site
schedule
Key Stats
Trees
bulbs
mixed ornamental grasses, shrubs, and herbicidal plants were planted in accordance with the landscape architect's plan
Project Challenges
The works had to be carried out during the month of December. The street was also open to the public. Therefore, the team had to operate in a public space with a large volume of pedestrian traffic especially for that time of the year. We had to use control measures to ensure the safety of both our operators and the public. The logistics and safety aspect required for delivering and planting trees were of the utmost importance. Everything was removed and locked away every evening.