Case Study – Interim Capel Street Improvement works

Introduction

Avondale Landscapes worked alongside the team from Cairn Construction to carry out the soft landscape aspect on Capel Street, Dublin City Centre. The works included executing the design from BSLA.

Duration

One-month landscape works with 1-year ongoing maintenance.

CLIENT

Cairn Construction

Location

Capel Street Dublin 1

Landscape Architect

BSLA

Key Features

N

Root barrier

N

live street

N

pedestrian management

N

Tidy work site

N

schedule

Key Stats

Trees

bulbs

mixed ornamental grasses, shrubs, and herbicidal plants were planted in accordance with the landscape architect's plan

Project Challenges

The works had to be carried out during the month of December. The street was also open to the public. Therefore, the team had to operate in a public space with a large volume of pedestrian traffic especially for that time of the year. We had to use control measures to ensure the safety of both our operators and the public. The logistics and safety aspect required for delivering and planting trees were of the utmost importance. Everything was removed and locked away every evening.