Case Study – Irish Rail hydroseeding embankment

Introduction

Avondale Landscapes completed a hydroseeding project along Wexford’s railway in the Autumn. The specification was for a durable and low-maintenance vegetation. It was necessary to ensure the survival of the seed over winter and the growth in springtime. To work on the Railway, training on Safety on the Railway lines was a necessary requirement. Our ability to meet this specification highlighted our expertise in this field

Duration

The project was completed in 4 days. This involved the organization of machinery, securing water supply, coordinating with Irish Rail’s timetable, and executing the seeding process.

CLIENT

Iarnord Eireanin

Location

North of Wexford Town

Key Features

N

FLEXTERRA Growth Medium mulch

N

Fescue seed used for low maintenance long term

N

Live railway

Key Stats

Water resource

Project Challenges

The program encountered significant challenges. Water had to be secured using a tractor and bowser as the railway line was in a secluded area. We liaised with Irish Rail to secure a timeline for us to complete the job thus preventing service disruptions and conducting hydroseeding operations near active tracks. This involved safety and operational constraints. Effective management and collaboration were crucial for the success of this project.

LONGER DESCRIPTION

The Wexford Railway Hydroseeding Project, completed over four days, showcased Avondale Landscapes’ experience in handling difficult environmental and logistic challenges. Hydroseeding method was chosen due to the efficiency and effectiveness of the procedure to ensure the establish of vegetation on difficult terrains. This method allowed for rapid seed germination and establishment, crucial for the tight project timeline and the need for durable, low-maintenance vegetation in a demanding railway environment. The project’s success showed our expertise in landscaping difficult terrains.