Introduction

The Intel Bluejay project focused on restoring a steep embankment where no topsoil was present—only compacted 804 stone formed the surface. Due to the slope gradient and underlying material, importing and placing topsoil was not a viable option from a safety or logistical perspective. ProGanics Biotic Soil Media was applied hydraulically to create a functioning growing layer capable of supporting vegetation and stabilising the embankment. Erosion control measures were then installed to improve long-term durability. Vegetation began to establish within days, resulting in a low-maintenance and environmentally stable solution.

Location

INTEL, Colinstown Industrial Park, Leixlip, Co.Kildare, Ireland
Intel

Client

INTEL Ireland Ltd.
Exyte Northern Europe Limited
INTEL Ireland Ltd. Exyte Northern Europe Limited

ARCHITECT

Jacobs
 
Jacobs
Intel Project Bluejay Hydroseeding

The Intel Bluejay project involved the rehabilitation of a steep embankment where no soil was present—only compacted 804 stone. This made traditional approaches to vegetation establishment impossible, as there was no organic base or structure to support planting. On top of that, the gradient of the slope made it unsafe and impractical to place topsoil, raising health and safety concerns and making the use of heavy machinery unsuitable.

To address these challenges, ProGanics Biotic Soil Media was applied directly onto the 804 stone. This media was selected for its ability to build up a growing layer where none existed, improving soil chemistry and providing the structure and nutrients needed to support vegetation. Its composition allows it to hold moisture, support beneficial microorganisms, and gradually enhance biological activity on even the most sterile substrates.

The product was applied hydraulically at a rate of 4,000–5,500 kilograms per hectare. This ensured consistent coverage across the slope and allowed the team to avoid the risks associated with hauling and spreading topsoil. Once in place, erosion control matting was installed over the treated area to further stabilise the embankment and help lock in moisture.

Within days, vegetation began to emerge. The new growing layer established itself quickly and is expected to continue improving over time as nutrient cycling and plant development progress. The use of ProGanics eliminated the need for imported topsoil and made the project safer, faster, and more efficient.

This project shows how a fully artificial growing layer can be successfully created even over hardcore stone, making ProGanics a practical and sustainable choice for difficult, exposed sites like the one at Intel Bluejay.