Seven Heroes Square Ballymun
Introduction
Seven Heroes Square is a public realm civic space delivered as part of Dublin City Council’s Greening the City initiative in Ballymun. The project forms part of the wider Ballymun regeneration strategy, providing a structured urban green space connecting civic buildings and pedestrian routes.
Avondale Landscapes was appointed by Cumnor Construction, working with landscape architects AECOM, to deliver the soft landscaping package including semi-mature trees, herbaceous planting, instant turf and SuDS soil systems.
Location
Ballymun, Dublin
Client
Dublin City Council
Cumnor Construction
ARCHITECT
Key Features
Public realm landscaping
Semi-mature tree planting
SuDS soil systems
Timber edging and knee rail
Herbicide-free maintenance
Key Metrics
herbaceous plants and ornamental grasses
instant turf
semi mature trees (30-65cm girth, 6m height)
Avondale Landscapes delivered the soft landscaping works at Seven Heroes Square, Ballymun, including semi-mature tree installation, herbaceous planting, turfing and specialist soil build-ups forming the green structure of the civic space.
A total of 35 semi-mature trees, ranging from 30–65cm girth and up to 6 metres in height, were installed across the square. Due to the size of the trees, careful coordination was required to source suitable stock and manage handling on site. Tree pits were prepared using SuDS soil and topsoil to support long-term establishment in an urban environment.
Approximately 4,500 herbaceous plants and ornamental grasses were installed to create structured planting beds throughout the public realm.
Species included Verbena bonariensis, Rudbeckia fulgida ‘Goldsturm’, Stipa tenuissima ‘Pony Tails’ and Agapanthus ‘Brilliant Blue’, providing seasonal interest and supporting biodiversity within a high footfall area.
Avondale Landscapes also installed 1,850m² of instant turf, ensuring immediate visual impact on completion. Timber edging and timber knee rail were installed to define planting areas and provide protection to newly planted beds.
Weather conditions towards completion resulted in saturated ground conditions, requiring careful sequencing of planting works to protect soil structure. Following completion in April 2025, extended dry periods required ongoing watering to support establishment of semi-mature trees and planting.
A late addition to the works included installation of a mature Abies nordmanniana Christmas tree within the square. This required coordination following completion of the primary planting works to ensure installation did not impact finished surfaces or surrounding planting areas.
Maintenance was carried out using a herbicide-free approach, with the site incorporated into Avondale Landscapes watering schedule to support successful plant establishment.
The project demonstrates Avondale Landscapes experience delivering public realm landscaping in Dublin, including installation of large tree stock, SuDS soil systems and coordinated planting within live urban environments.